TECHNICAL INCINERATORS SPECS FOR 2 medical facilities
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
INTRO
All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
The incinerator shall be run on a 3-phase power supply (mains)
For the technical evaluation, not only the treatment plant but the entire system will be considered. It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
The Bidder must provide a warranty for one year.
All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as. The provisional and final acceptance shall take place at the final destination.
After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
Providing the name and address of its authorised maintenance, service and repair centre,
Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
The Bidder shall supply and install the incinerator with the following attached specifications
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
ITEM
DESCRIPTION
UNIT
QTY
RATE
KSHS.
Incinerator
To supply and install the following
2NO.
Hospital Incinerators to Nema standards
The following are the incinerator specifications :-
A
Ø Waste type: Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste
Ø Waste density: 125 to 350Kg/M³
Ø Waste CV: 4000 KCAL/Kg
Ø Moisture content: 10-25%
Ø Estimated ash residue: 5-10%
Ø Nominal capacity: 100Kg/hour batch load
Ø Secondary chamber: 2 second @ 1100ºC
Ø Environmental: NEMA ACT (EMCA) 1999
Clean Air Act 1999
BS3316 1987
Equipment
Set
The Incinerator must comprise of: –
Ø Manual Loading door (heavy duty steel door with appropriate refractory lining)
Ø Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long
Ø Full sized bulk load/ash removal door
Ø 1 off diesel-fired ignition burner – temperature controlled
Ø 1 off combustion air supply fan and distribution system, automatic control
Ø High capacity secondary combustion chamber 2 second @ 1100ºC with
Ø 1 off diesel-fired afterburner – temperature controlled
Ø Control Panel – automatic operation
Ø Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)
Ø Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator
Carried Forward To Collection Page.
NOTE: WE REQUIRE TWO INCINERATORS. ONE
ITEM
DESCRIPTION
UNIT
QTY
RATE
KSHS.
B
Diesel Tank:
To provide for diesel service tank (Capacity 400 litres) including level indicator
The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.
Item
1
C
Installation & commissioning works
D
Positioning of Incinerator: –
EVALUATION STANDARD
Item
1
E
Connect burners to fuel supply.
No.
2
F
Chimney Installation:
G
Composition of the chimney: –
Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.
100
Pass mark for technical analysis is 70/100 marks
Item.
1
H
Commissioning & Training:
Testing set operating parameters, training of operators and technical staff.
Item
1
I
Commissioning Maintenance Contract
Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). The maintenance contract price includes labour, transport and accommodation for the attending technicians.
Item
3
Stage 3: Internet Site Browse With
The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD
NO
NO
1
NO
1
ITEM
DESCRIPTION
UNIT
QTY
MARKS ALLOCATED
MARKS RECEIVED
Incinerator
To supply and install the following
2NO.
Hospital Incinerator to Nema standards
The following are the incinerator specifications :-
A
Ø Waste type: Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste
35
Ø Waste density: 125 to 350Kg/M³
Ø Waste CV: 4000 KCAL/Kg
Ø Moisture content: 10-25%
Ø Estimated ash residue: 5-10%
Ø Nominal capacity: 100Kg/hour batch load
Ø Secondary chamber: 2 second @ 1100ºC
Ø Environmental: NEMA ACT (EMCA) 1999
Clean Air Act 1999
BS3316 1987
Equipment
Set
The Incinerator must comprise of: –
Ø Manual Loading door (heavy duty steel door with appropriate refractory lining)
Ø Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long
Ø Full sized bulk load/ash removal door
Ø 1 off diesel-fired ignition burner – temperature controlled
Ø 1 off combustion air supply fan and distribution system, automatic control
Ø High capacity secondary combustion chamber 2 second @ 1100ºC with
Ø 1 off diesel-fired afterburner – temperature controlled
Ø Control Panel – automatic operation
Ø Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)
Ø Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator
ITEM
DESCRIPTION
UNIT
QTY
RATE
KSHS.
B
Diesel Tank:
To provide for diesel service tank (Capacity 400 litres) including level indicator
Hallmark of tenderer
Item
1
20
C
Installation & commissioning works
D
Positioning of Incinerator: –
Note: In situation of variance in between system price as well as total quantity, the device price will control.
Item
1
10
E
Connect burners to fuel supply.
No.
2
5
F
Chimney Installation:
G
Composition of the chimney: –
AREA VI – – – – CONVENTIONAL FORMS
TECHNICAL INCINERATORS SPECS FOR 2 clinical centers
INTRODUCTORY
Item.
1
10
H
Commissioning & Training:
Testing set operating parameters, training of operators and technical staff.
Item
1
10
I
Commissioning Maintenance Contract
Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). The maintenance contract price includes labour, transport and accommodation for the attending technicians.
Item
3
10
TOTAL
The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.
EXAM CRITERIA
Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.
100
Pass mark for technological evaluation is 70/100 marks
Phase 3: Web Site Browse Through
The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.
Phase 4 Company Analysis
ITEM
Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.
ITEM DESCRIPTION
UNIT
QTY. REQUIRED
UNIT PRICE (KHS)
REMARKS
1.
Supply, Delivery, installation and commissioning of Incinerator in
NO
1
2.
Supply, Delivery, installation and commissioning of Incinerator
NO
1
Trademark of tenderer
Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.
Technical Comparison of HICLOVER Waste Incinerators for Diverse Applications What are the key features of HICLOVER waste incinerators? HICLOVER waste incinerators are designed with advanced engineering standards,…
Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency The adoption of advanced Somalia pet incinerator systems, which comply with high industrial standards and specific temperature…
HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management Informational Layer: Understanding Waste Incineration Waste incineration is a waste treatment process that involves the combustion of organic…
HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management 1. What are waste incinerators and how do they work? Waste incinerators are specialized incineration…
Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create a variety of health and environmental risks if not managed…
animal incinerator prices according to the capacity or the size want to cremation. The pet cremation equipment humanized design with movable platform, small space covers for modern…