domestic incinerator

Documents to be submitted as following ;

  • Fabricators accreditations
  • Test report to prove ZERO harmful emission level provided as samples form other installations
  • Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.

 

Technical proposal include:

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

  • The hospital should provide the necessary space: building & infrastructure, sufficient power steam supply and

connection up to room water & sewage line to the room

  • Room preparation: preparation, Renovation & Modification of the room is suppliers responsibility
  • The supplier should submit the necessary drawing showing space requirements ( room size (LxWxH) dimensions of

processors & ancillary equipment

  • Supplier must give the proposal of the total power requirement of the whole unit and on which the hospital will

ensure the power supply. However connections inside the room is suppliers responsibility

  • The connection/fittings form the processor and ancillary equipment to water and sewage line is suppliers

responsibility.

  • A detailed training proposal including the duration of staff training on how to operate and maintain the processor
  • A detailed maintenance schedule.
  • List of spare parts and accessories required for maintenance of the system

 

Warranty & After Sales Services:

  • Warranty period will be minimum 03 years or as offered by the manufacturer which comes later.
  • Warranty period will be counted from the date of handing over of machine over of machine to the user in functioning

condition i.e date of commission.

  • In warranty period supplier have to provided all maintenance & repair services.
  • Breach time will not be counted in warranty period.
  • At least 10 years back up service (including warranty period) has to be ensured by the supplier.
  • The repair/maintenance work should be carried out within 72 hours after getting request for such from the user.

 

Quality standard: CE/FDA certificate of the offered item must be submitted with the offer.

  • For verification of the certificate bidder must submit the following :
  1. i) Mailing address of the issuer of the certificate.
  2. ii) Website, Email address & Fax & Telephone Number of the issuer.
  • The bid will be non-responsive if:
  1. i) The certificate issuer can not be reached
  2. ii) The issuer fails to authentic the certificate within the bid validity

iii)   The issuer confirms that the submitted certificate is defective in terms of authenticity or validity.

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Related Posts

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency The adoption of advanced Somalia pet incinerator systems, which comply with high industrial standards and specific temperature…

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management Informational Layer: Understanding Waste Incineration Waste incineration is a waste treatment process that involves the combustion of organic…

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management 1. What are waste incinerators and how do they work? Waste incinerators are specialized incineration…

steps of medical waste management

Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create a variety of health and environmental risks if not managed…

animal incinerator prices

animal incinerator prices according to the capacity or the size want to cremation. The pet cremation equipment humanized design with movable platform, small space covers for modern…

Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model TS50(PLC) Picture Principle Solid Waste Incineration Burn Rate 30-45 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke…