CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC AND INDUSTRIAL) AT A MINIMUM RATE OF 300KG/HR WITH THE FOLLOWING SPECIFICATIONS:

Ø  PRIMARY CHAMBER VOLUME 7.2M³

Ø  BURNING CAPACITY 300Kgs/hr.

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

Ø  PRIMARY CHAMBER TEMPERATURE 850⁰C AND SECONDARY CHAMBER TEMPERATURE 1100⁰C

Ø  REFRACTORY THICKNESS 225MM; REFRACTORY WITHSTAND TEMPERATURE 1400⁰C

Ø  RAM LOADER CAPACITY 0.75M³; OPERATIONAL CYCLES PER DAY 8-16 Hrs.

Ø  FUEL DIESEL/NATURAL GAS; NUMBER OF PRIMARY BURNERS & RATING: 2 @ 250kw

Ø  NUMBER OF SECONDARY BURNERS & RATING: 2 @ 400kw; ELECTRICAL SUPPLY 230V 60Hz

Ø  BIN TIPPER, MONITORING SYSTEM, CLEANING SYSTEM

Ø  GAS CLEANING AND GAS MONITORING.MSW1000 General Medical Waste Incinerators burn rate up to 100kg/hr
A2400 Animal / poultry Waste Incinerators burn rate up to 200kg/hr.Laboratory  waste Management  system
01. Liqued water purification system.
02. Number of laboratories    – 05
03. The estimated liquid water waste    – 6000 L including
a. chemicals
b. toxins
c. Bio Hazardous materials.
Temporary allocated space for purifications system- 30×20
The following should be indicating in the biding document
1.Method of disposing treated waste water
2.Method of discarding the sludge
3.To follow ISO standard/regulations of Central Environment Authority[CEA]
4.Time frame for construction
5.Request the cost for each item of the project [Consultancy/designing/construction] as well for the whole project.
6.Warranty period and maintaincne.

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Related Posts

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency The adoption of advanced Somalia pet incinerator systems, which comply with high industrial standards and specific temperature…

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management Informational Layer: Understanding Waste Incineration Waste incineration is a waste treatment process that involves the combustion of organic…

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management 1. What are waste incinerators and how do they work? Waste incinerators are specialized incineration…

steps of medical waste management

Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create a variety of health and environmental risks if not managed…

animal incinerator prices

animal incinerator prices according to the capacity or the size want to cremation. The pet cremation equipment humanized design with movable platform, small space covers for modern…

Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model TS50(PLC) Picture Principle Solid Waste Incineration Burn Rate 30-45 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke…