BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FEET CONTAINER


BIOHAZARD DISPOSAL: CONTAINER

GENERAL INCINERATOR, SUITABLE FOR INCINERATION OF VARIOUS KINDS OF WASTE, ABSOLUTELY CONTAINERISED IN A 20 FT CONTAINER, TO CONSIST OF BUILT-IN FUEL CONTAINER As Well As GENERATOR.

HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

TECHNICAL SPECS: SHEDDING CHAMBER AMOUNT (M3); 0.54 m3. SUGGESTED SET SIZE: 60 KG, BURN COST: 69 KG PER HR, STANDARD GAS USAGE 13 KG PER HR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMPERATURE LEVEL. MONITORING, STANDARD ASH DEPOSIT: 3%, THERMOSTATIC TOOL: YES,
DIMENSIONS: OUTSIDE LENGTH (mm): 1520MM, EXTERNAL SIZE (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Burner for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers have to exist
4. temperature degree of main chamber ought to be 850 levels Celsius
temperature level of added chamber must be 1200 levels Celsius


[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Related Posts

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency

Advanced HICLOVER Waste Incinerators: Integrating Engineering Precision with Economic Efficiency The adoption of advanced Somalia pet incinerator systems, which comply with high industrial standards and specific temperature…

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management

HICLOVER Waste Incinerators: Cost-Effective Solutions for Global Waste Management Informational Layer: Understanding Waste Incineration Waste incineration is a waste treatment process that involves the combustion of organic…

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management

HICLOVER Waste Incinerators: Engineering Reliability and Global Market Leadership in Waste Management 1. What are waste incinerators and how do they work? Waste incinerators are specialized incineration…

steps of medical waste management

Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create a variety of health and environmental risks if not managed…

animal incinerator prices

animal incinerator prices according to the capacity or the size want to cremation. The pet cremation equipment humanized design with movable platform, small space covers for modern…

Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model TS50(PLC) Picture Principle Solid Waste Incineration Burn Rate 30-45 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke…