Bangor’s former incinerator property is not for sale, authority officials say

The Bangor Borough Authority will not sell the former incinerator property. Not right now, at least. The board voted Thursday evening to support authority Chairman Donald Butz’s…

Waste Incinerator, Pet Cremator

Bid to burn waste from out of town in Newhaven Incinerator

Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove. It argues this will…

Incinerator with Capacity of destruction in weight: 60 Kg/h.

Capacity of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible…

Texas Ebola waste will not be disposed in Louisiana

On Friday Attorney General Buddy Caldwell announced the State of Louisiana reached an agreement with Texas incinerator Veolia Environmental Services and Louisiana hazardous waste landfill Chemical Waste…

Campaigners welcome Heathrow’s plans to move incinerator

Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around the town. The airport said it altered…

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%Construction Constructed from heavy duty mild or aluminized  steelOr equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings    ProvidedLoading Manual loading of wastePrimary Burner                        Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type                                               Flange mountedBlower   Provided.  3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type     3.3    Secondary chamber

Tinian solid waste: Where to go?

THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or off-island disposal. The Marine Forces Pacific recently held an ad hoc…

50kgs per hour incinerator, Oman farm animal cremation

New Metro incinerator would cost $1.3 billion more than planned: study

Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with a new study commissioned by waste company Belkorp Environmental Services suggesting…