HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
GeneralDescription
The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:
Overall plant layout
Feed chamber/charging
Primary combustion chamber
Particulate scrubbers
Acid gas
The stack/chimney.
Minimum capacity of primary chamber = 10cubic meters
Burn rate (rate of waste incineration) = 10 kg per hour
Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
Scope Of Work
The work specified in the contract will include.
Supply, install and commission an incinerator as provided in the technical specifications
Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )
Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with Commissioning and maintenance instructions for the Incinerator they intend to Supply, install and commission.
Tenderers who fail to comply with this requirement fully shall have their tender rejected.
TECHICAL SPECIFICATIONS OF THE INCINERATOR
3.1 Feeding and Charging
Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.
Primary Combustion
This chamber should be equipped with burners that use low sulphur
The chamber should ensure a minimum exit temperature of 850 degrees
This unit should operate at over 1100 deg C to ensure complete
This chamber should be equipped with burners that use low sulphur
Heavy-duty steel casing
High quality refractory lining and insulation
Large full size top load door and liquid retention
1 x oil fired ignition burners operated on/off
Secondary Combustion Chamber (After burner)
Heavy-duty steel casing
High quality refractory lining and insulation
1 x oil burner
Should be fitted with burners that use low sulphur
Ensure secondary air supply is controlled.
Ensure residence time is not less than two seconds.
Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
Ensure the emitted oxygen content of the emitted gases is not less than 11%
Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
Particulate Removers
A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
Cyclone separator
Electrostatic precipitators
Fabric filters
Chimney/Stack
The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
The chimney should be visible to the operator from the feeding
The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
The point for measurement of emissions shall be
Instrumentation
Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
A carbon monoxide and oxygen meter/recorder should be
A smoke density meter/recorder should be
A solid particulate meter/recorder should be
Any other instrument that may be considered
Location / Siting of the Incinerator
a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
Emission Limits
Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x
100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.
The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
Ease of Use
Auto
No pilots to
Automatic control and temperature monitoring
Built-in skid facilitates placement
Fuel Efficiency
Rapid incineration means low fuel
Up to 20kgs per hour (dependant on application).
Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
Quality Built to Last
Heat resistant 3mm
Stainless steel
Key Features
Low running and maintenance costs
Fully Automatic and simple to operate control panel
Afterburner Preheat
Incineration Temperatures in Excess of 900 degrees C
3 mm Steel Casing and Fully insulated
Dense Refractory Concrete Lining Rated to 1400 degrees C
Solid Hearth to Allow Maximum Burnout
Large Top Opening Lid For Easy Loading
Stainless Steel Flue as standard
12 Months or 1000 hours
Optional Stainless Steel Casing
Heat Recovery System option
3.13
Fuel and Capacity
1.
Low sulphur fuel
2.
Capacity (Cubic Mtr)
.10
3.
Average Capacity
40kg
4.
Fuel Consumption (ltrs / hr)
3
External Dimensions
1.
Length (mm) 735
2.
Width (mm) 500
3.
Height Incl. Flue (mm)
1960
4.
Door Opening (mm)
325 x 325
Internal Dimensions
1.
Length (mm)
620
2.
Width (mm)
390
3.
Height
500
Operation
Minimum Operating Temperature 950
Maximum Operating Temperature 1320
3.
Burn rate per hour
5-20kgs
4.
Temperature Monitoring
Available
Particulate Removers
A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
Cyclone separator
Electrostatic precipitators
Fabric filters
Chimney /Stack
The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
If possible the chimney should be visible to the operator from the feeding
The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
Point for the measurement of emissions shall be
Control Panel
Control of 2 burners
Timer control 0- 12 hours
Integral fan timer control
Temperature and thermostatic control
SCHEDULE 2
NO:
REQUIREMENTS
SUPPLIER’S REMARKS
1.
Experience
Previous experience in the supply, installation and commissioning of incinerators
2.
1 Year Maintenance Contract
3.
Work rate
at least10kg per day
4.
Design
Basic Plan design to Provide Overall plant layout. With Feed chamber/ charging, Primary Combustion Chamber. Secondary Combustion Chamber. Particulate Scrubbers, Acid Gas Scrubbers, The stack/ chimney.
Fuel oil tank storage should be Mild steel 1000 liters capacity
Chimney Height should be of 10 meters above ground level.
Housing facility with one waste storage room
Provide Housing designs with adequate cross ventilation
Chamber (Afterburner Maximum exit temperature should not be less than 1100oC
5.
Standard control panel
Safety interlock, Fan Starter, Burner on/ off switch/door safety switch, Auto close down switch, temperatures control mechanism.
6.
Combustion Chambers
Primary Combustion Chamber Minimum exit temperature should not be less than 850oC
Secondary Combustion Maximum exit temperature should be not less than 1100oC
SECTION VII
PRICE SCHEDULE FOR GOODS
Price schedule for Supply, Installation, Testing and Commissioning of an incinerator for Turkwel Power Station
1
2
3
4
5
6
Item
Description
Unit of sale
Quantity
Unit price
Total price
1.
Supply, install, and commission the incinerator as specified.
LOT
1
2.
Construct a standard incinerator housing facility as per the drawing and architectural notes provided
LOT
1
4.
Construct one waste storage room (provide specs on room size, construction material etc)
LOT
1
5.
Supply / adhere to the requirement of OSHA 2007 act
49,50,51,60,61,77,78,79,80,81,100
LOT
1
6.
Onsite training of Operation and Maintenance staff.
LOT
1
7.
All the key Spares (Attach a separate List)
LOT
1
8.
Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level.
LOT
1
9.
Supply of Operation and Maintenance Manuals.
LOT
1
10.
All other items not specified but necessary to complete the Installation. A separate list of these items to be attached.
LOT
1
11.
Fencing of a compound of 10 meter length by 10 meter width using Concrete poles high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate)
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory….
incinerator china, call hiclover brand(www.hiclover.com). Nanjing Clover Medical Technology Co.,Ltd. is top incinerator supplier in china and supply single combustion chamber, double combustion chambers, three combustion chambers…
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory….
HICLOVER brand is holder of Nanjing Clover Medical Technology Co.,Ltd. we are incinerator manufacturer in china and we made waste incinerator for medical waste, pet cremation, animal…
low-cost medical waste incinerator is good idea for small clinic, small hospital, etc.Incineration is the only method providing complete destruction and neutralization of the medical waste ideally…
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory….